Skip to main content

Bypass maintenance projects at A47 Hinckley, A426 Blaby and A6 Market Harborough

Part of approx. £5m of funding allocated from the Department for Transport to assist with Covid-19 recovery and help stimulate the economy and the highways supply chain.

A6 Market Harborough Bypass

The maintenance work on the A6 at Market Harborough began mid-January 2021 and was completed on 26 February 2021.

The work included:

  • road resurfacing and strengthening
  • reinstatement of road markings and studs
  • footpath resurfacing
  • replacement of damaged kerbs
  • drainage repair.
Top of page